Caversham and central Reading terraces almost always trigger Section 2 and Section 6 of the Party Wall Act. Here's the right order to do things — and what happens if you don't.

Reading's Victorian terraces — Caversham, Newtown, Coley — are loft and basement gold. They're also a Party Wall Act minefield. Skipping a step doesn't save you time; it adds months and risks an injunction.

The correct sequence

  1. Architect produces drawings showing the structural intent.
  2. Eligibility check — which sections of the Act apply?
  3. Notice drafted and served at least 1–2 months before works begin.
  4. 14-day response window. Neighbour consents, dissents, or stays silent.
  5. Schedule of Condition of the adjoining property.
  6. Award drafted, agreed and served (if dissent or silence).
  7. Works can lawfully begin.

Skip step 3 and your builder is exposed to an injunction — the neighbour can apply to the County Court and stop the job. We see this in Reading two or three times a year.

Section 2 vs Section 6 — what's the difference?

  • Section 2 covers work to the party wall itself: cutting in steels for a loft, removing a chimney breast, raising the wall. Two months' notice required.
  • Section 6 covers excavation near a neighbour's foundations — within 3 m at any depth lower, or within 6 m if the depth is lower than a 45° line from the bottom of their foundations. One month's notice required.

Basement conversions usually trigger both sections, plus often a Section 1 if you're underpinning to the boundary line.

What goes wrong in Reading

  • "Verbal agreement" with the neighbour. Not worth the paper it's not written on. The Act requires written notice and a written response.
  • Email notice only. Most Reading conveyances allow service by post or hand — email is risky without prior agreement.
  • Starting before the notice period expires even if the neighbour has already consented in writing. Technically fine, but only with a clear written acknowledgement.

Fixed fees, no surprises

£50 to draft and serve the first notice; £850 if an Award is needed. Get your Reading quote in 60 seconds.